
Today, our engineer and I visited a customer's factory in Owerri. This customer placed an order for the TANFON 150KW solar power system in 2019, which provides electricity to their factory equipment and office.
You can click on the following link to see the installed solar power system:
https://www.tanfon.com/faq/FAQ-About-Big-3-Phase-Solar-System-Installation.html
Recently, our team came to Abuja for the installation of 150KW and 2MW sample projects, and we took the opportunity to visit our loyal customer. Our engineer, along with the factory electricians, inspected the system's performance, operational data, and component status to ensure its smooth operation. We also provided proper training on system maintenance and operation, and collected their feedback and suggestions to improve our products and services.
Nigeria has become one of our main markets, and we visit the country every year to provide installation guidance and periodically revisit our customers. We are not only selling products but also committed to providing excellent service for your solar power system.
TANFON SOLAR takes the ultimate responsibility for your solar energy usage.
22KW On Grid Solar System in Netherlands
The King of the Democratic Republic of the Congo has provided a solar energy storage power station system for the village of Bunkeya to meet the electricity needs of 2500 small households in the village. As the village currently lacks access to the grid, the King requested the design of a 1MW solar panel system paired with a 1.8MWh lithium battery storage system to power the entire village.