Free cookie consent management tool by TermsFeed Cookies
FAQ
Home > FAQ >

Policy about wind solar energy system in Ireland

0 admin 2020-12-11 15:41:55

According to our customers’ statement, if installation home wind turbine system within the regulation restrictions, do not need system installation plannning permission.

As per Irish regulation, if i build a wind turbines within these restrictions, I do not need planning permission

residential wind turbine kits

10kw wind turbine

* wind turbine with total height not more that 7.5m,This includes the rotor top blade!

* 3m minimum clearance required between the ground and lowest point of blades

* it could go 0.5 m higher to complying with the max hight

Another customer says

* total height must not exceed 20m

* tor dismeter must not exceed 8m

* 3m minimum clearance required between the ground and lowest point of blades

50kw wind generator

We have the suitable solution for above both.

< >

TANFON SOLAR: Cooperation with Nigerian Senator MR.MORO

8MW Solar System for City TINE, Valued by President of Chad

Tanfon Solar IoT APP

China Safety Solar system Leading Brand

Dealer Policy

Tanfon 200KW solar power project in Papua New Guinea installation