According to our customers’ statement, if installation home wind turbine system within the regulation restrictions, do not need system installation plannning permission.
As per Irish regulation, if i build a wind turbines within these restrictions, I do not need planning permission

* wind turbine with total height not more that 7.5m,This includes the rotor top blade!
* 3m minimum clearance required between the ground and lowest point of blades
* it could go 0.5 m higher to complying with the max hight
Another customer says
* total height must not exceed 20m
* tor dismeter must not exceed 8m
* 3m minimum clearance required between the ground and lowest point of blades
We have the suitable solution for above both.
The King of the Democratic Republic of the Congo has provided a solar energy storage power station system for the village of Bunkeya to meet the electricity needs of 2500 small households in the village. As the village currently lacks access to the grid, the King requested the design of a 1MW solar panel system paired with a 1.8MWh lithium battery storage system to power the entire village.