This is a wood processing plant located in Slovakia. During the production process, the load fluctuations of major processes such as cutting, bonding, and grinding are large, which brings certain challenges to production. In order to smooth the load curve, the customer installed a 300kWp photovoltaic power generation system and a 250kW/500kWh energy storage system in the plant. The inverter selected is TANFON SOLAR MPS0250. Since the system was put into operation, the wood processing plant has implemented a one-charge-one-discharge operation strategy every day, so that the energy storage system is charged during the valley price period and discharged during the peak price period, further improving the overall energy management efficiency and greatly saving electricity expenses.
The King of the Democratic Republic of the Congo has provided a solar energy storage power station system for the village of Bunkeya to meet the electricity needs of 2500 small households in the village. As the village currently lacks access to the grid, the King requested the design of a 1MW solar panel system paired with a 1.8MWh lithium battery storage system to power the entire village.