Free cookie consent management tool by TermsFeed Cookies
150kw on off grid solar power system.jpg
150kw on off grid solar power system.jpg

150KW on off grid solar power system

150KW on off grid solar power system

Place Of Origin: Foshan, Guangdong Province, China

BrandName: Tanfon Solar

MOQ: 1 set,Accpet OEM &ODM

Certificate: TUV, ETL, ISO, CE, RoHS

Payment: T/T, L/C, Paypal, Western Union

15 years

industry leading technology

24 hours

uninterruptible power supply

0 distance

online service

Megawatt solar energy storage system

 

This scheme is applicable to the distribution system composed of photovoltaic, energy storage, power load and power grid(generator).
The application of the system in the power grid mainly includes the following scenarios:
Peak shaving and valley filling: by charging and storing energy at valley time and discharging energy at peak time, the electricity cost of customers can be reduced and the electricity charge at the power consumption end can be saved for customers.
Demand response: when the short-term power consumption is greater than the transformer capacity, the energy storage system will discharge rapidly to meet the load power demand
Dynamic capacity increase: energy storage equipment is used to replace the capacity of transformer in peak period to help customers reduce and reduce the expansion cycle and cost of transformer investment.


Off grid standby power supply: when the power supply of the power grid is interrupted, provide uninterrupted short-term power supply for important loads to reduce the economic losses caused by sudden power failure of loads.
The solar generation is given priority to the user's load to achieve the maximum economic operation, and the excess energy is stored in the daytime; 
When the photovoltaic power generation does not meet the load use, the load is powered by photovoltaic + energy storage; If the photovoltaic + energy storage does not fully meet the use of the load,it will be introduced by the mains to provide reliable power supply for the load; When the solar is redundant and the energy storage battery is full, and the photovoltaic surplus power is sale to grid.

 

150KW on off grid solar power system

FS550W PERC Shingled solar panel(USA TR Technology panel)
Vmp:39.47V        Voc:48.077V  Imp:13.942A       Isc:14.672
210*210 cells     Efficiency:20.54%
weight:26KG   Size:2239*1042*35mm each 15pcs in series
Strong anti-cracking advantage  
 25 years product warranty 

Model:H6T-360v Multiple PV strings inputs

Simplify wiring between PV array

and controller, protections to controller ,

Wide range of DC input voltage

Reliable thunderstorm& surge protection

max circuit voltage: 1000V

BD150KTR-P

MAX PV input:150KW   MPPT range:250-850V

Rate current:216A   Output power:165KVA

Otuput voltage :400V , 3L+N+PE  

Battery voltage:420V   European Efficiency:97.5%

Size:1200 x 2050 x 800 mm  Weight:1120KG

Communication:Standard: RS485 / CAN / DRM

 Optional: WiFi

Capacity:2V/600AH  

The latest through-wall welding technology,  

more suitable for motor loads.

Service life:8-10 years , Size:320x190x390mm  

Connect way: 240pcs connect in series

Have Circuit breakers, disconnectors,

surge protection, self-supporting overvoltage protectors, disconnectors. The main role is lightning protection, overvoltage protection, undervoltage protection.

700KW 700KVA Off Grid Solar Power System With Battery Storage

Slope Rooftop /Flat rooftop/ground

wind load:55m/s,snow load:1.5kn/m2

structure:Anodized Aluminum+stainless steel, Angle adjustable

(other type of rack can be customized as per client’s requirement )

1)128pcs 25mm2*2M battery cable

25mm 25M power cable

2)4mm2 PV cable 100M*4pcs

3)terminals and MC4+2P 0A Power switch box

4) one set MC4 tool

 

Frequently asked questions

Read more commonly asked questions or learn about what solar storage is.

Request a Quote

we will get back to you as soon as possible

loading